Monday, October 18, 2010

Miscarriage Knee Pain

8 km to 2 - fourth edition

Segnalo an initiative already well-communicated by the District but it deserves the widest participation found in recent years, and because it gives the possilibità to know and appreciate the athletic course of study to those who do not live Salvemini nearby. 24 will take place Sunday morning in the fourth edition of the 8 km 2, tender Running created on 11 November 2007 to inaugurate the jogging path built in the gardens and the park of course Salvemini Palatucci. Organised by Cirscoscrizione 2 with ASD "Jordan Lombardi, the racing has been a great success and was revived in subsequent years, each time involving several hundred people (800 last year). Departure at 9.00 for the junior categories, at 10.00 for adults. Course Fee: € 5 adults competitive, competitive young € 2, € 1 non-competitive. La Centrale del Latte di Torino, the sponsors, this year it was made available to provide the t-shirt and a small kit of refreshment arrival.


There will be a competitive race and a non-competitive, which run along the jogging path and the paths between the course Salvemini and venue of the District, following this procedure: starting from Cascina Giajone, Via Romita, jogging path - Course Salvemini, Park police commissioner Course Allamano / gardens Don Rinaldi-off-course Palatucci Salvemini - Via Romita, Via Canonica, Street Dance (school building E10), arrival in Cascina Giajone.


Massimo

Tuesday, October 12, 2010

Revostyler Philippines

assurances


Last spring was kind of a justified concern
Garden City in the event of realization of a building near the twin houses . Concern is fueled by ' article in "The Stam pa" April 23 (page of "Quarters"). After a study of the issue with the President of the District, Andrea Stara, who had verbally assured me they had requested, but do not publish in detail the then "leaks", and now "La Stampa" has largely made public .
The building will be done, but with a very different impact than feared (urban load separately). In summary, the houses will be lower than expected (three floors and five), with fewer apartments, and located on the west side of the "South Lot" Area (south of the church "Most Holy Name of Mary"), rather than in the north. So, as written in the article, the buildings will not be behind the two-family which would have shade, but will be close to the condominiums and houses of average height.
The sum of the two plots of land area is classified as ATS (Area of \u200b\u200bTransforming Services): the owner can build only if the City sells a significant proportion of the area, 80%. of two lots, one church is north of Holy Name of Mary, the other is south of the adjacent parish, and within the enclosure includes an industrial building and a large green area (eye I would say in a better condition that the lot "north", despite what is written in the article) .


Massimo

Wednesday, October 6, 2010

How Longdoing Zumba Before You See Results

Street Garden City condo Baltimore 91: One-way

With resolution discussed in Committee II on September 15 and approved by the Council of the District on September 20 last year, were the commitments taken in recent months with the residents of Baltimore street 91, already recounted in a previous post .
The Baltimore area via 91, the former home of a Social-therapeutic Centre closed for some years for problems of asbestos, was originally done by the City between the furniture to sell (alienate) . The local residents opposed the sale, worried about the loss of the green area at their disposal and for the loading of a new urban condominium, with the need for services that would entail.
The council of the PD group and the local party have spoken on behalf of the opposition, and thanks to the councilor planning, Mario Viano, via Baltimore 91 was separated from the act of changing land uses, in fact being removed from the list of areas subject to alienation.



The text of the resolution passed on September 20 is available here
. With the variant is retained for services but entrusted the management of individuals. Despite the usual arguments of some, the private management is currently the only viable way and that will allow the remediation of asbestos in a reasonable time. This is a very different result from the initial project (construction and sale to private of accommodation) avoided thanks to the aforementioned work of PD. The amendment provides for a drastic reduction of deliberate "cube" of the building to be implemented (in fact hosting services and not a building) as well as a large space between it and the road (at least 30 meters).

Massimo